抹面砂漿在施工后需要馬上保養(yǎng),保養(yǎng)需要留意施工時(shí)的溫度,在依據(jù)溫度的狀況確認(rèn)保養(yǎng)時(shí)需要準(zhǔn)備的材料,此外也是有無(wú)需保養(yǎng)的產(chǎn)品,
濟(jì)南抹面砂漿具體保養(yǎng)條件如下所示:
The plastering mortar needs to be maintained immediately after construction. The maintenance needs to pay attention to the temperature during construction. The materials to be prepared for maintenance should be confirmed according to the temperature condition. In addition, there are products that need to be maintained. The specific maintenance conditions of Jinan plastering mortar are as follows:
冬天施工日平均氣溫小于5°C時(shí)要按冬天施工并滿足以下規(guī)定:
When the daily average temperature of winter construction is less than 5 ° C, the construction shall be carried out in winter and meet the following requirements:
1.施工前要采取一定的有效措施加熱基礎(chǔ)表層,使其溫度維持在KTC以上,并清理存水。
1. Before construction, certain effective measures shall be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up the water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
2. Before being cooled, the compressive strength of cement-based engineering materials shall not be less than 6MPa.
高溫氣候環(huán)境施工施工位置溫度超過(guò)37°C,應(yīng)按高溫氣候延緩施工并滿足以下規(guī)定:
If the temperature of the construction site in the high-temperature climate exceeds 37 ° C, the construction shall be delayed according to the high-temperature climate and meet the following requirements:
1.施工前24小時(shí)采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take certain effective measures 24 hours before construction to avoid direct radiation or other radiant heat at the construction site.

2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎(chǔ)和設(shè)備底板的溫度不可超過(guò)37°C。
2. Take appropriate temperature reduction measures, and the temperature of concrete foundation and equipment base plate in contact with cement-based engineering materials shall not exceed 37 ° C.
3.料漿的入模溫度不可超過(guò)35°C。
3. The injection temperature of slurry shall not exceed 35 ° C.
4.施工后應(yīng)及時(shí)采取補(bǔ)濕保養(yǎng)措施。
4. Moisturizing and maintenance measures shall be taken in time after construction.
免保養(yǎng)條件如下所示:
The maintenance-free conditions are as follows:
施工溫度超過(guò)5°小于37°時(shí),基礎(chǔ)施工后無(wú)需保養(yǎng)。超過(guò)溫度范圍應(yīng)遵循抹面砂漿施工保養(yǎng)方法實(shí)行保養(yǎng)。
When the construction temperature is more than 5 ° and less than 37 °, no maintenance is required after the foundation construction. If the temperature exceeds the range, the plastering mortar construction and maintenance methods shall be followed.
冬天保養(yǎng)需要準(zhǔn)備的材料:棉被、薄膜這些材料主要是為了保溫,因?yàn)槎鞙囟冗^(guò)低,因此需要做好保溫防范準(zhǔn)備
Materials to be prepared for winter maintenance: cotton quilt and film are mainly used for heat preservation. Because the temperature is too low in winter, it is necessary to prepare for heat preservation
夏天保養(yǎng)需要準(zhǔn)備的材料:薄膜,薄膜主要是為了補(bǔ)濕,預(yù)防水分的太早外流造成產(chǎn)品施工內(nèi)部無(wú)法牢固,此外一定要按時(shí)灑水,灑水的也是為了補(bǔ)濕,因?yàn)樵谑┕ず髢?nèi)部反應(yīng)需要大量水分。
Materials to be prepared for maintenance in summer: film, which is mainly used to supplement moisture, to prevent water from flowing out too early and causing the internal construction of the product to be unstable. In addition, it is necessary to sprinkle water on time, which is also used to supplement moisture, because a large amount of water is required for internal reaction after construction.
針對(duì)抹面砂漿施工后需要養(yǎng)護(hù)嗎這個(gè)問(wèn)題,我們就講解到這里了,您對(duì)此有怎樣的疑惑或者需求,歡迎隨時(shí)咨詢聯(lián)系我們
http://www.wxccxs.com!
For the question of whether the plastering mortar needs to be cured after construction, we will explain it here. If you have any doubts or needs about it, please contact us at any time http://www.wxccxs.com !