建筑外墻膩?zhàn)臃鄣氖┕ひ⒁馐裁矗?/p>
來源:http://www.wxccxs.com 日期:2024-06-07 發(fā)布人:
一、混凝土面層施工技術(shù)
1、 Construction technology for concrete surface layer
1.將外墻膩?zhàn)臃叟c清水(用量為7:3)混合均勻,然后批在表面(用一米尺刮)。當(dāng)表面粗糙時(shí),加入40 —— 80目石砂。刮出來的表面感覺不光滑,晾干后用清水滾一滾。
1. Mix the exterior wall putty powder with water (in a ratio of 7:3) evenly, and then apply it to the surface (scrape with a one meter ruler). When the surface is rough, add 40-80 mesh stone sand. The scraped surface doesn't feel smooth. After drying, roll it with clean water.
2.將外墻膩?zhàn)臃叟c清水(用量6: 4)混合,然后在表面進(jìn)行批涂。批量刮削后,膩?zhàn)臃蹚S家,表面會(huì)很光滑。稍干時(shí),用砂皮擦亮。如果可能的話,用清水噴在單板上,然后用稀釋的界面劑(1: 1)滾在表面。干燥后,進(jìn)行表面敲擊檢查。
2. Mix the exterior wall putty powder with water (dosage 6:4), and then apply it in batches on the surface. After batch scraping, the surface of the putty powder manufacturer will be very smooth. When slightly dry, polish with sandpaper. If possible, spray clean water onto the veneer and then roll on the surface with diluted interface agent (1:1). After drying, perform surface tapping inspection.
二、注意事項(xiàng)
2、 Precautions
1.天氣潮濕多雨時(shí)不能施工,溫度低于5℃時(shí)不能施工。要求表面滾涂的間隔時(shí)間為4 —— 7天(只能在膩?zhàn)訅A性成分中和后才能施工,內(nèi)外墻膩?zhàn)臃蹚S家,否則容易產(chǎn)生泛堿現(xiàn)象)。
1. Construction cannot be carried out when the weather is humid and rainy, and construction cannot be carried out when the temperature is below 5 ℃. The interval for surface roller coating is required to be 4-7 days (construction can only be carried out after the alkaline components of the putty are neutralized, and the putty powder manufacturers for inner and outer walls are not allowed, otherwise it is easy to cause alkaline phenomenon).
2.當(dāng)干燥度過高時(shí),請(qǐng)?jiān)谀佔(zhàn)颖砻娣磸?fù)噴水,這樣可以縮短膩?zhàn)拥闹泻蜁r(shí)間和強(qiáng)度。
2. When the drying is too high, please spray water repeatedly on the surface of the putty, which can shorten the neutralization time and strength of the putty.
3.玻璃馬賽克裝飾裝修建議采用“專用界面膠”作為界面材料,而不是上述施工工藝。
3. It is recommended to use "specialized interface adhesive" as the interface material for glass mosaic decoration, rather than the above construction process.
4.施工工藝可參照J(rèn)J/T29-2003《建筑裝飾工程施工及驗(yàn)收規(guī)范》的規(guī)范。
4. The construction process can refer to the specifications of JJ/T29-2003 "Code for Construction and Acceptance of Building Decoration Engineering".
三、瓦墻改造施工技術(shù)
3、 Construction technology for tile wall renovation
1.清潔瓷磚墻壁。界面劑與外墻膩?zhàn)臃刍旌暇鶆颍ㄓ昧繛?:6)后,刮在瓷磚墻面上(用量少,批刮重要,每平方米膩?zhàn)臃塾昧坎淮笥?.5kg),批刮后表面粗糙待干。
1. Clean the ceramic tile walls. After mixing the interface agent and exterior wall putty powder evenly (in a dosage of 4:6), scrape it onto the ceramic tile wall surface (the dosage is small, batch scraping is important, and the amount of putty powder per square meter is not more than 0.5kg). After batch scraping, the surface should be rough and dry.
2.將外墻膩?zhàn)臃叟c清水(用量為7:3)混合均勻后批在表面(用一米尺刮)。刮出來的表面感覺不光滑,晾干后用清水滾一滾。
2. Mix the exterior wall putty powder with water (in a ratio of 7:3) evenly and apply it to the surface (scrape with a one meter ruler). The scraped surface doesn't feel smooth. After drying, roll it with clean water.
3.將外墻膩?zhàn)臃叟c清水(用量6: 4)混合,內(nèi)外墻膩?zhàn)臃?,然后在表面進(jìn)行批涂。批量刮削后,表面會(huì)很光滑。稍干時(shí),用砂皮擦亮。如果可能的話,用清水噴在單板上,然后用稀釋的界面劑(1: 1)滾在表面。干燥后,進(jìn)行表面敲擊
3. Mix the exterior wall putty powder with clean water (dosage 6:4), apply the interior and exterior wall putty powder, and then apply it in batches on the surface. After batch scraping, the surface will be very smooth. When slightly dry, polish with sandpaper. If possible, spray clean water onto the veneer and then roll on the surface with diluted interface agent (1:1). After drying, perform surface tapping